Crescent Crown Distributing - Mesa

Project type: Industrial New Construction

General Contractor: LGE

Duration: April 2011 – January 2012

Scope: 330,000 sq. ft. ground up distribution facility. Project consisted of a 260,000 sq. ft. warehouse building with attached 60,000 sq. ft. two story office and a separate 10,000 sq. ft. vehicle service building.

 

DSG Distribution Center - Shell

Project type: Industrial New Construction

General Contractor: The Renaissance Companies

Duration: January 2012 – August 2012

Scope: 600,000 sq. ft. ground up distribution facility.

 

Amazon PHX -6 T.I./Lot #4

Project Type: Industrial/Commercial T.I.

General Contractor: The Renaissance Companies

Duration: September 2010 – December 2010

Scope: Fast track build-out of an existing 1 million + sq. ft. tilt slab. K2 was selected as one of three electrical contractors for the project; K2’s main focus was 45,000 sq. ft. of office with smaller build-outs throughout the entire building. Additionally, the project required extensive lighting control for the LEED Certified Silver requirements.

 